Calculators / Hardscape
How many blocks for your retaining wall?
Put in the length and how tall it shows above ground. You'll get blocks, caps, gravel and drain pipe, and a straight answer on height.
Order this much
168 blocks
That's 8 courses of 12 x 4 in block plus 21 caps, with 2 courses buried. Under and behind it goes 4.5 tons of gravel.
- Blocks
- 1688 courses × 20
- Caps
- 21
- Base gravel
- 1.5 tons0.7 cu yd
- Drain gravel
- 3 tons2 cu yd, plus 20 ft pipe
courses = 24 in ÷ 4 in = 6 up, + 2 buried (6 in) = 8
per course = 20 ft × 12 ÷ 12 in = 20, rounded up
blocks = 20 × 8 × 1.05 waste = 168
caps = 20 × 1.05 = 21
base = 20 ft × 2 ft wide × 0.5 ft deep = 20 cu ft = 0.7 cu yd × 1.4 = 1.5 tons
drain gravel = 20 ft × 1 ft × 2.7 ft tall = 53.3 cu ft = 2 cu yd × 1.4 = 3 tons
pipe = 20 ft of 4 in perforated, plus the run to daylight
Bury 2 courses below grade, 8 in. Dig the trench 14 in deep so the 6 in base fits under it.
Line the dirt side of the drainage gravel with non-woven fabric so mud doesn't clog it.
See non-woven geotextile fabric on Amazon (opens Amazon in a new tab)As an Amazon Associate we earn from qualifying purchases.
Lay the pipe holes down at the back of the base, and run it out to daylight. Add that outlet run to the 20 ft.
Glue caps down with landscape block adhesive. Two beads per cap.
See landscape block adhesive on Amazon (opens Amazon in a new tab)Call 811 a few days before you dig. They mark buried gas and power lines for free.
How we work it out
We count courses up the face, add the courses you bury, and multiply by the blocks in one course.
courses = height ÷ block height, + buried courses
blocks = (length × 12 ÷ block length) × courses × 1.05
Bury 1 in for every 8 in of wall, 6 in at least. The 5% covers broken blocks and cuts.
base gravel = length × 2 ft wide × 0.5 ft deep
drain gravel = length × 1 ft × wall height from the base
Over 4 ft of held-back soil, the IRC wants an engineered design. Same goes for a wall over 2 ft with a driveway or slope above it. Lots of towns measure from the bottom of the footing, and some permit anything over 3 ft. Call yours before you dig.
Where the numbers come from
More calculators
- MulchHow many yards of mulch for my beds?
- GravelHow many tons of gravel for my path or driveway?
- Topsoil and fillHow much soil to fill or level my yard?
- Sod and seedHow much sod or seed for my lawn?
- Paver patioHow many pavers and how much base for my patio?
- Concrete padHow much concrete for my shed or hot tub pad?
- FenceHow many posts, rails and pickets for my fence line?
- DeckWhat joist size and spacing does my deck span need?
- Shed fitWill a shed fit my setbacks and get through my gate?
- Hot tubCan my deck hold it, and can my panel power it?
- Sprinkler zonesHow many zones will my water pressure run?