Grab the tub's spec sheet. We'll work out what it weighs full, what that does to a deck, and if your panel has room for the circuit.
Your deck can't hold it
108 psf on a 50 psf deck
Filled with 6 people in it, the tub weighs 5,296 lb. That's about 2.2 times what a normal deck is built for.
- Full weight
- 5,296 lb
- Load
- 108 psfdeck built for 50
- Panel
- 86 Aof 100 A
- Tub circuit
- 240 V, 50 A
water = 400 gal × 8.34 lb = 3,336 lb
people = 6 × 185 lb = 1,110 lb
full = 850 + 3,336 + 1,110 = 5,296 lb
footprint = 84 in × 84 in ÷ 144 = 49 sq ft
load = 5,296 lb ÷ 49 sq ft = 108 psf vs 50 psf deck
tub = 240 V × 50 A × 80% = 9.6 kVA
lights and plugs = 1800 sq ft × 3 VA = 5.4 kVA
house loads = 5.4 kVA + kitchen and laundry circuits 4.5 kVA + appliances 7.5 kVA + hot tub 9.6 kVA = 27 kVA
counted = 8 kVA + (27 kVA − 8 kVA) × 40% = 15.6 kVA
with heat and AC at 100% = 15.6 kVA + 5 kVA = 20.6 kVA
load = 20.6 kVA ÷ 240 V = 86 A of your 100 A panel
The two checks
- Weight5,296 lb full over 49 sq ft108 psf on a 50 psf deck
Too heavy for a deck built to normal code. Pour a pad or get an engineer.
- Panel86 A of 100 A with the tub14 A to spare
Room for a 240 V, 50 A tub circuit.
Put it on a 4 to 6 in concrete pad at ground level, or pay an engineer to beef up the deck. Extra joists alone won't fix the posts and footings.
The 50 A circuit needs GFCI protection (NEC 680.44). The shutoff goes within sight of the tub and at least 5 ft from the water (NEC 680.13). Most people use a spa panel with a GFCI breaker.
A 240 V tub circuit takes an electrical permit in most towns. Many inspectors also check the pad or deck.
How we work it out
First the weight. Water is heavy, and so are the people in it.
full weight = dry weight + gallons × 8.34 lb + seats × 185 lb
load = full weight ÷ footprint in sq ft
A deck built to code is designed for 50 psf: 40 for people and 10 for the deck. Most full tubs land between 100 and 130 psf. That's why we say put it on a concrete pad, or have an engineer design the deck for it.
Then the power. We add the tub to your house with the NEC 220.83 method for existing homes. In the 2026 NEC that section moved to 120.83. Lights and plugs count 3 VA per sq ft. Appliances count at nameplate. The first 8 kVA counts in full, the rest at 40%, and heat and AC count in full on top.
tub load = volts × breaker amps × 80%
panel amps = total VA ÷ 240 V
If that comes out over your main breaker, the tub won't fit without changes. Under 10 A to spare, we call it tight. A 240 V tub also needs GFCI protection and a shutoff within sight of the tub, at least 5 ft from the water.
Where the numbers come from
More calculators
- MulchHow many yards of mulch for my beds?
- GravelHow many tons of gravel for my path or driveway?
- Topsoil and fillHow much soil to fill or level my yard?
- Sod and seedHow much sod or seed for my lawn?
- Paver patioHow many pavers and how much base for my patio?
- Retaining wallHow many blocks, and how tall before it needs an engineer?
- Concrete padHow much concrete for my shed or hot tub pad?
- FenceHow many posts, rails and pickets for my fence line?
- DeckWhat joist size and spacing does my deck span need?
- Shed fitWill a shed fit my setbacks and get through my gate?
- Sprinkler zonesHow many zones will my water pressure run?