From IRC 2021 Table R507.5(1), 40 psf live load. Your town can amend it, so the building department has the final say.
Short answer
With 12 ft joists in southern pine, a double 2x10 beam spans 7 ft 4 in post to post. A double 2x12 spans 8 ft 7 in, and a triple 2x12 spans 10 ft 9 in. Longer joists mean shorter beam spans.
How to read it
Find the column for how far your joists span to the beam. Then go down to your beam. The number is the farthest apart your posts can be. A 2-2x10 is two 2x10s nailed together.
Joist span here is the effective span. If your joists hang past the beam, see the factor below first.
Max beam span
| Beam | 6 ft | 8 ft | 10 ft | 12 ft | 14 ft | 16 ft | 18 ft |
|---|---|---|---|---|---|---|---|
| 1-2x6 | 4 ft 7 in | 4 ft | 3 ft 7 in | 3 ft 3 in | 3 ft | 2 ft 10 in | 2 ft 8 in |
| 1-2x8 | 5 ft 11 in | 5 ft 1 in | 4 ft 7 in | 4 ft 2 in | 3 ft 10 in | 3 ft 7 in | 3 ft 5 in |
| 1-2x10 | 7 ft | 6 ft | 5 ft 5 in | 4 ft 11 in | 4 ft 7 in | 4 ft 3 in | 4 ft |
| 1-2x12 | 8 ft 3 in | 7 ft 1 in | 6 ft 4 in | 5 ft 10 in | 5 ft 5 in | 5 ft | 4 ft 9 in |
| 2-2x6 | 6 ft 11 in | 5 ft 11 in | 5 ft 4 in | 4 ft 10 in | 4 ft 6 in | 4 ft 3 in | 4 ft |
| 2-2x8 | 8 ft 9 in | 7 ft 7 in | 6 ft 9 in | 6 ft 2 in | 5 ft 9 in | 5 ft 4 in | 5 ft |
| 2-2x10 | 10 ft 4 in | 9 ft | 8 ft | 7 ft 4 in | 6 ft 9 in | 6 ft 4 in | 6 ft |
| 2-2x12 | 12 ft 2 in | 10 ft 7 in | 9 ft 5 in | 8 ft 7 in | 8 ft | 7 ft 5 in | 7 ft |
| 3-2x6 | 8 ft 6 in | 7 ft 5 in | 6 ft 8 in | 6 ft 1 in | 5 ft 8 in | 5 ft 3 in | 4 ft 11 in |
| 3-2x8 | 10 ft 11 in | 9 ft 6 in | 8 ft 6 in | 7 ft 9 in | 7 ft 2 in | 6 ft 8 in | 6 ft 4 in |
| 3-2x10 | 13 ft | 11 ft 2 in | 10 ft | 9 ft 2 in | 8 ft 6 in | 7 ft 11 in | 7 ft 6 in |
| 3-2x12 | 15 ft 3 in | 13 ft 3 in | 11 ft 10 in | 10 ft 9 in | 10 ft | 9 ft 4 in | 8 ft 10 in |
| Beam | 6 ft | 8 ft | 10 ft | 12 ft | 14 ft | 16 ft | 18 ft |
|---|---|---|---|---|---|---|---|
| 1-2x6 | 4 ft 1 in | 3 ft 6 in | 3 ft | 2 ft 8 in | 2 ft 5 in | 2 ft 3 in | 2 ft 1 in |
| 1-2x8 | 5 ft 6 in | 4 ft 8 in | 4 ft | 3 ft 6 in | 3 ft 2 in | 2 ft 11 in | 2 ft 9 in |
| 1-2x10 | 6 ft 8 in | 5 ft 10 in | 5 ft 1 in | 4 ft 6 in | 4 ft 1 in | 3 ft 9 in | 3 ft 6 in |
| 1-2x12 | 7 ft 9 in | 6 ft 9 in | 6 ft | 5 ft 6 in | 5 ft | See code | See code |
| 2-2x6 | 6 ft 1 in | 5 ft 3 in | 4 ft 9 in | 4 ft 4 in | 3 ft 11 in | 3 ft 7 in | 3 ft 3 in |
| 2-2x8 | 8 ft 2 in | 7 ft 1 in | 6 ft 4 in | 5 ft 9 in | 5 ft 2 in | 4 ft 8 in | 4 ft 4 in |
| 2-2x10 | 10 ft | 8 ft 7 in | 7 ft 9 in | 7 ft | 6 ft 6 in | 6 ft | 5 ft 6 in |
| 2-2x12 | 11 ft 7 in | 10 ft | 8 ft 11 in | 8 ft 2 in | 7 ft 7 in | 7 ft 1 in | 6 ft 8 in |
| 3-2x6 | 7 ft 8 in | 6 ft 8 in | 6 ft | 5 ft 6 in | 5 ft 1 in | 4 ft 9 in | 4 ft 6 in |
| 3-2x8 | 10 ft 3 in | 8 ft 10 in | 7 ft 11 in | 7 ft 3 in | 6 ft 8 in | 6 ft 3 in | 5 ft 11 in |
| 3-2x10 | 12 ft 6 in | 10 ft 10 in | 9 ft 8 in | 8 ft 10 in | 8 ft 2 in | 7 ft 8 in | 7 ft 2 in |
| 3-2x12 | 14 ft 6 in | 12 ft 7 in | 11 ft 3 in | 10 ft 3 in | 9 ft 6 in | 8 ft 11 in | 8 ft 5 in |
| Beam | 6 ft | 8 ft | 10 ft | 12 ft | 14 ft | 16 ft | 18 ft |
|---|---|---|---|---|---|---|---|
| 1-2x6 | 4 ft 2 in | 3 ft 7 in | 3 ft 1 in | 2 ft 9 in | 2 ft 6 in | 2 ft 3 in | 2 ft 2 in |
| 1-2x8 | 5 ft 4 in | 4 ft 7 in | 4 ft 1 in | 3 ft 7 in | 3 ft 3 in | 3 ft | 2 ft 10 in |
| 1-2x10 | 6 ft 6 in | 5 ft 7 in | 5 ft | 4 ft 7 in | 4 ft 2 in | 3 ft 10 in | 3 ft 7 in |
| 1-2x12 | 7 ft 6 in | 6 ft 6 in | 5 ft 10 in | 5 ft 4 in | 4 ft 11 in | 4 ft 7 in | 4 ft 4 in |
| 2-2x6 | 6 ft 2 in | 5 ft 4 in | 4 ft 10 in | 4 ft 5 in | 4 ft | 3 ft 8 in | 3 ft 4 in |
| 2-2x8 | 7 ft 10 in | 6 ft 10 in | 6 ft 1 in | 5 ft 7 in | 5 ft 2 in | 4 ft 10 in | 4 ft 5 in |
| 2-2x10 | 9 ft 7 in | 8 ft 4 in | 7 ft 5 in | 6 ft 9 in | 6 ft 3 in | 5 ft 10 in | 5 ft 6 in |
| 2-2x12 | 11 ft 1 in | 9 ft 8 in | 8 ft 7 in | 7 ft 10 in | 7 ft 3 in | 6 ft 10 in | 6 ft 5 in |
| 3-2x6 | 7 ft 8 in | 6 ft 9 in | 6 ft | 5 ft 6 in | 5 ft 1 in | 4 ft 9 in | 4 ft 6 in |
| 3-2x8 | 9 ft 10 in | 8 ft 6 in | 7 ft 7 in | 6 ft 11 in | 6 ft 5 in | 6 ft | 5 ft 8 in |
| 3-2x10 | 12 ft | 10 ft 5 in | 9 ft 4 in | 8 ft 6 in | 7 ft 10 in | 7 ft 4 in | 6 ft 11 in |
| 3-2x12 | 13 ft 11 in | 12 ft 1 in | 10 ft 9 in | 9 ft 10 in | 9 ft 1 in | 8 ft 6 in | 8 ft 1 in |
No. 2 grade, wet service, 10 psf dead load. In-between joist spans can be interpolated. "See code" marks two cells we couldn't confirm from a clean copy.
When the joists overhang the beam
Multiply your joist span by this factor to get the effective joist span, then use that column.
| Overhang ÷ joist span | Factor |
|---|---|
| No overhang | 0.66 |
| 1/12 | 0.72 |
| 1/10 | 0.80 |
| 1/8 | 0.84 |
| 1/6 | 0.90 |
| 1/4 | 1.00 |
12 ft joists with a 2 ft overhang is 1/6, so the effective span is 12 × 0.90 = 10.8 ft.
Building the beam
Nail the plies together with two rows of 10d nails, 16 in apart, on each side. The beam needs 1 1/2 in of bearing on a wood post or metal cap, 3 in on concrete. It can run past the last post a quarter of its span.
These spans assume 40 psf of people and furniture. A hot tub loads a deck far past that, so its beam needs an engineer.